Front:
LONG SAULT DAM
...
INTERNATIONAL SEAWAY
POWERHOUSE
BOUNDARY
CORNWALL
Back:
SK9302
EUR
ER
multatele
ST. LAWRENCE SEAWAY and POWER PROJECT
Cornwall, Ontario, Canada
This model shows the huge 2,200,000-horsepower
St. Lawrence Power Project, and a section of the
international Seaway in the Power Project area,
as they will appear when completed. In the centre
is the powerhouse being built jointly by Ontario
Hydro and the Power Authority of the State of
New York. Bisecting the international boundary
line, it will span the St. Lawrence River between
the Canadian mainland, just west of Cornwall,
Ontario, and the eastern end of Barnhart Island.
Extending out fom either side of the powerhouse
are the dykes which will contain the headpond
or water storage area. The Long Sault dam (upper
centre) will combine with the power plant itself to
obtain and control this headpond in the amount
required to operate the generators. To the left is
a model section of the Seaway, showing proposed
locks.
44
pe
POSTES CANADA ostat
OSBE
PM
1920
Published by Bryan News Co., Cornwall, Ontario
A"Shini Color" by ''Colourpicture", Boston 15, Mass , U.S.A.
1-Jope you
7/20/56
Rev. a Mrs.W.I tetterly
had
210 Fourteenth Ave
trip. We are
Scranton 4 4
grand time. The
Weather is excellent Pennsylvania
Fetterlys
USA,
a nice
havin
IN
Photo Courtesy of Ontario Hydro