Interior of Detroit River Tunnel
Additional Details:
The Detroit River Tunnel was built for the M. C. R. R. at a cost of $8,500,000. It is 1 1/4 miles in length. Construction was started in July 1906 and completed July 191o. Electricity, the third real system, furnishes the motive power for the engines. |