Front:
Everything all right. Gave a deed of the farm
OKTA
NEW TROLLEY BRIDGE, STAFFORD SPRINGS, CONN.
Length of center span, 153 feet. The two side spans about 74 feet each. The bridge is 25 feet clear above the
Central Vermont tracks, and 42 feet above the water. The two cement piers are about 40 feet high above the ground.
this G.M. Watil for an auction notice neph B.
Ben.
Back:
- ما
Esto
Mr. Geo. R. Gray
Sh
JUN
45 P
190
ASCONN
THERA
# 89 Broad St
2. Sem
SERIEN 1902
UNITED STATES OF
1706 FRANKLIN 17290
New London,
л Сони