Front:
Copyright Photo by MAURER
GREATER GALVESTON
CAUSEWAY
Commenced September 21, 1909, to be completed December, 1910. Cost, $1,500,000.00. Total length, 10,642
feet; height, 16 feet above mean low tide; Roadway portion width, 154 feet; Arch Bridge width, 66 feet; will-
consist of 28 Arches with a 70 foot span, a length of 2,358 feet. There will be three railroad tracks and two
Interurban tracks and County Driveway. Rolling Lift Bridge will give clear waterway of 100 feet. Founda-
tions for Arches will go from 11 to 16 feet below bottom of Bay.
263 Protected Roadway
Back:
17
AZ
'.
O HERE
15
A z384
AZ