Front:
Approach to the Sagamore Bridge, Cape Cod, Mass.
61279
Back:
THE APPROACH TO THE
SAGAMORE BRIDGE, CAPE COD, MASS.
This magnificent structure was completed in 1935 at
an approximate cost of $1,500,000. Length 1833 ft.;
central span 135 ft. above high water; width of arch 500 ft.;
maximum height of steel work above sea level 270 ft.
BREWS
ONS CANT
STAME
AUG 23
this has
been a nice .
trip. Hest wishes
to be remember
to 누
PM
SCARD
hass
thon Deos
"TICHNOR QUALITY VIEWS" REG. U. S. PAT. OFF. MADE ONLY BY TICHNOR BROS., INC., BOSTON, MASS.
Miss F. Baner
5431 Walnut St
Thila fa