Front:
11837, dy
THE FORTH BRIDGE-THE LABOUR OF 5000 MEN (DAY AND NIGHT) FOR 7 YEARS
ENGINEERS SIR JOHN FOWLER & SIR BENJAMIN BAKER
CONTRACTOR SIR WILLIAM ARROL
COST OVER £3,500,000
miles including approaches. Two clear spans
Highest part above high water level, 361 feet.
feet. Weight of steel used, 51,000 tons.
Total length of viaducts over 1
Two spans of 680 feet ea.
below high water level, 91
5.000.000
of 1710 feet ea.
Deepest foundation
Number of rivets,
Back:
to you thiree from Fablen & Weothier,
Aug 11/28 VALENTINE'S
FOR COMMUNICATION
A train is jed going
over wenked writing
this card.
Bean to see the sight
want yerlerday to sten
Eagles, lovely spot.
Juntgot your mail.
Leaving tomorrow for
bban, then bu
towards dondon Love
PHOTOGRAPH
THIS IS
SUFE
3303412
28
POSTAG
EVENUE
(THREE HALFPENCE
PINTO
GREAT BRITAIN.
Mesin Lack's Peros.
15 hackes Blas
Joubert st
Johammerlig
S. Africa.