Front:
G0629
GA783
CAUSEWAY---CALIFORNIA STATE HIGHWAY---BETWEEN SACRAMENTO AND DAVIS. CONCRETE
CONSTRUCTION. COST $400,000.00. LENGTH 3 1-10 MILES; WIDTH 26 FEET.
DEDICATION SACRAMENTO MAY 11TH TO 14TH, 1916.
501
Back:
SPONDENCE HERE
NAME AND ADDRESS HE
- Sh