Tower Bridge
Additional Details:
This new million doller lift bridge spans the Sacramento River at "M"Street onb Highway 40.The lift span weights 2,300,000 pounds ,counter balanced with an equal weight and is 200- feet long .At flood stage it has 100 foot clearance and is one of the highest in the world of the lift bridge type |