FACTS ABOUT BAGNELL DAM
PROGRESS
STREAM FLOW
Construction started
Spillway cofferdam unwatered
First cóncrete poured
Diversion channel opened
Power station cofferdam unwatered Aug.1Il 1930
Largest day concrete poured 5,080cu.yds.
Largest poured month
Construction completed
Aug. 6 1929
May 1 1930
April 21 1930
July 221930
Drainage area
' Maximum recorded flow 110,000cu,ft,šec.
Minimum recorded flow
Average flow,
14,000 są.mi.
324 cu.ft.sec,
10,500 cu.ftsec.
RESERVOIR
112,980 cu. yds.
April 1931
Area
Length
Shoreline
Water impounded
95 sq mi.
129 miles
1,300 miles
, ´, 650 billion gals.
DAM
Length including headworks
Length of spillway section
Length of abutment section
Length of headworks
Max, height bedrock to highway
PRINCIPAL QUANTITIES
2,543 ft.
520 ft.
1,512 ft
, 511 ft.
148 ft,'
Earth excavation
Rock
Concrete
Reinforcing steel
Structural steel
Gates, trash racks, guides 2,100 tons
Hydró-electric machinery 1,500 tons
Form work
Reservoir clearing,.
Labor of 20,0oo men used in the prep
-aratory and construction work which contin-
-ued day and night.
937,000 cu.yds.
72,500 cu.yds.
553,000 cu.yds.
, 2,300 fons
1,500 tons
Max, widih base of spillway í31t10.5 in.
Í31ît 10.5 in.
Max, width base of abutment
93ît 3 in.
Cost of proJect over 30 million dollars
2,100,000 sq,t.
26,000 acres
LOCATION
136 miles -airline- to,
36 miles -airline - to
75 miles above confluence of Osage and
Missouri Rivers.
St. Louis
Jefferson City
MISSOURI STATE HIGHWAY COMMISSION
VANK
Back:
FRANK E. GRESS, BROOKFIELD, MO.
all rights reserved
سارت 7
سے لا
کے گلے