Front:
AN ESTIMATED 10 BILLION
BARRELS OF CRUDE OIL
PRUDHOE BAY
FRANKLIN BLUFFS ▪
CRAZY
HORSE
HAPPY VALLEY I
LUPINE
TOOLIK
GALBRAITH=
CHANDALAR, ATIGUN
DIETRICH
COLDFOOT
PROSPECT CREEK.
OLDMAN.
ARCTIC
5 MILE
CIRCLE
ALASKA's
OIL PIPELINE
LIVENGOOD
FAIRBANKS
DELTA
PAXSON.
GLENNALLEN.
48 INCH PIPE, 789 MILES LONG
TONSINA
WILL CROSS 3 MOUNTAIN RANGES
& 70 RIVERS or STREAMS
SHEEPCREEK
ANCHORAGE
VALDEZ
12 PUMPING STATIONS
21 CONSTRUCTION CAMPS
WITH CENTRAL COMPUTER
CONTROL AT VALDEZ THE PIPELINE
IS DESIGNED FOR A MAXIMUM
CAPACITY OF 2 MILLION BARRELS
OF CRUDE OIL A DAY
3 YEARS IN CONSTRUCTION
C_ ANADA
Back:
INTERPRISES
CIRCLE
INC
723748"21000
ACE-0093
© ARCTIC CIRCLE ENTERPRISES®, ANCHORAGE, ALASKA
Oil was first discovered on Alaska's North Slope at Prudhoe Bay in March
1968. Studies on a proposed pipeline started as early as August of the
same year. In September 1969 the State of Alaska held a Lease Sale of
Prudhoe Bay land, a record 900 million dollars was paid to the State by
those winning these leases.
There has been an unheralded number of engineering, ecological and
permafrost studies along the pipeline route to assure safety of Alaska's wild-
life and ecology
Temperatures along the pipeline route vary from as much as 100° F. in
summer to more than 75° F. below zero in winter.
The pipeline was three years in construction and cost over 8 billion
dollars – the largest and most costly project ever undertaken by private
industry
8680-D